MUHIBBAH Engineering (M) Bhd has secured a supply and installation job from the Mass Rapid Transit Corp Sdn Bhd for the Sungai Buloh-Serdang-Putrajaya line, commonly referred to as MRT Line 2. Under package V201 to V210, the extensive scope of works for the second MRT line will be for a contract sum of approximately RM189 million, and “substantial” completion is set for the end of 2019.

(The Malaysian Reserve, 22/12/17)

+603-21612522      

All rights reserved (C) 2019

Jones Lang Wootton